Launch offer — valid today only

📄 Digital book in PDF · read it on your phone or print it

Inspection & Testing for the 2391, Drawn Every Test in the Same Order

Safe isolation, R1+R2, ring final continuity, insulation resistance, Zs and the 80% rule, RCD testing, the Schedule of Test Results and C1, C2, C3 and FI coding. Each topic has its own page: the drawing first, then what you need to remember. 68 illustrated pages.

START STUDYING THIS WAY

🔒 Secure checkout · PDF by email · 30-day guarantee

Every topic, its own pageEach test drawn, with the explanation alongside
68 illustrated pages9 parts, from your multifunction tester to EICR coding
Up-to-date sourcesBS 7671, IET Guidance Note 3 and HSE GS38
PDF by emailFormat

Look Inside the Book

Each page has one big drawing and a box with the readings, numbers and steps you need to know:

EIC for a new circuit, Minor Works for no new circuit, EICR for an existing installation
EIC for a new circuit, Minor Works for no new circuit, EICR for an existing installation
Two-pole indicator to BS EN 61243-3, GS38 probes, never a volt stick to prove dead.
Two-pole indicator to BS EN 61243-3, GS38 probes, never a volt stick to prove dead.
Inspection first, installation disconnected, Schedule of Inspections as your checklist
Inspection first, installation disconnected, Schedule of Inspections as your checklist
Dead tests per Regulation 643: continuity, ring, insulation, SELV/PELV, polarity, earth electrode (TT).
Dead tests per Regulation 643: continuity, ring, insulation, SELV/PELV, polarity, earth electrode (TT).
Regulation 643.10: switchgear, controls, interlocks, isolators and the RCD test button.
Regulation 643.10: switchgear, controls, interlocks, isolators and the RCD test button.
TN: 0.4 s and 5 s. TT: 0.2 s and 1 s. Table 41.1, U0 = 230 V.
TN: 0.4 s and 5 s. TT: 0.2 s and 1 s. Table 41.1, U0 = 230 V.
New circuit = EIC · no new circuit = Minor Works · existing condition = EICR
New circuit = EIC · no new circuit = Minor Works · existing condition = EICR
Intervals: private rented (England) 5 years · owner-occupied 10 years · construction sites 3 months · petrol stations 1 year
Intervals: private rented (England) 5 years · owner-occupied 10 years · construction sites 3 months · petrol stations 1 year

Swipe to see more →

These are real pages from the book. The table of contents is the full one: 9 parts and 64 topics.

The Problem Isn't You. It's How It Was Explained.

You're on the practical, standing at the consumer unit, and the assessor asks what you do first. Your hand is already reaching for the tester.

The guide does say inspection comes before testing. But it says it in paragraphs, between regulation numbers and footnotes, so you nod, turn the page and the order doesn't stay.

Inspection first, installation disconnected, Schedule of Inspections as your checklist

In this book that topic is one page: the installation drawn disconnected, inspection marked as step one, and the Schedule of Inspections drawn as your checklist, box by box.

Safe isolation, the dead tests in order, the live test sequence, maximum Zs and EICR coding: each one gets its own page, drawn the same way.

You know what comes first, why it comes first and what to tick, and you do it without going back to the guide.

COMPARE FOR YOURSELF

The Same Topic, Two Ways to Study It

THIS
  • The guide: line after line
  • Safe isolation explained in words only
  • You turn up to the practical with doubts
Prior to the commencement of any work on or near an electrical installation, it is necessary to ensure that the relevant circuits have been isolated. The voltage indicator employed should comply with the relevant British and European standards, being of the two-pole type, and the test leads and probes should satisfy the recommendations of GS38. Non-contact voltage detectors are not considered suitable for the purpose of confirming that conductors are dead, and the correct functioning of the indicator should be confirmed on a known live source before and after use.
FOR THIS
  • Safe isolation in one drawing
  • Prove – test – prove, in one box
  • Volt stick crossed out, two-pole indicator and GS38 probes drawn
Two-pole indicator to BS EN 61243-3, GS38 probes, never a volt stick to prove dead.
CONTENTS

Take a Look at the 9 Parts and 64 Topics

Before the tester, safe isolation, inspection, dead tests, live tests, maximum Zs, certificates and schedules, EICR coding and revision for the practical and the written exam: 68 pages, all illustrated.

IBefore You Pick Up the Tester · pp. 5-11
  1. Initial verification vs periodic inspection
  2. What the 2391 asks you to do
  3. The documents on your bench
  4. Your instruments: the multifunction tester
  5. GS38: leads and probes
  6. Calibration and checking your tester
  7. Earthing systems at a glance
IISafe Isolation · pp. 12-17
  1. Why safe isolation comes first
  2. The safe isolation sequence, step by step
  3. Prove – test – prove
  4. Testing dead: every combination
  5. Locking off: MCBs, fuses and main switch
  6. Isolating for Ze and main bonding tests
IIIInspection Before Testing · pp. 18-23
  1. Inspection comes before testing
  2. The origin: service head to consumer unit
  3. Earthing and main protective bonding
  4. Cables, routes and zones
  5. Special locations: bathrooms
  6. RCD, AFDD and SPD: what you check by eye
IVDead Tests, in Order · pp. 24-35
  1. The dead test sequence
  2. Continuity of protective bonding
  3. R1+R2: the shorting-link method
  4. R2: the wander-lead method
  5. Ring final step 1: end-to-end
  6. Ring final step 2: line–neutral cross-connection
  7. Ring final step 3: line–cpc cross-connection
  8. Insulation resistance: test voltages and minimums
  9. Insulation resistance: preparing the circuit
  10. Insulation resistance: which tests, between what
  11. Polarity, tested dead
  12. Earth electrode resistance (TT)
VLive Tests, in Order · pp. 36-43
  1. The live test sequence
  2. Measuring Ze
  3. Measuring Zs
  4. Prospective fault current: PSCC and PEFC
  5. RCD testing: what you test now
  6. RCD testing: setting up the tester
  7. Functional testing
  8. Phase sequence and voltage drop
VIMaximum Zs and Disconnection Times · pp. 44-49
  1. Why Zs matters: the disconnection chain
  2. Disconnection times
  3. Reading the BS 7671 maximum Zs tables
  4. The 80% rule: correcting for temperature
  5. Type B, C and D: same rating, different Zs
  6. When Zs is too high: what you check
VIICertificates and Schedules · pp. 50-54
  1. EIC, Minor Works and EICR: which one when
  2. The Schedule of Circuit Details
  3. The Schedule of Test Results
  4. Supply characteristics and earthing arrangements
  5. Signatures and responsibility
VIIIPeriodic Inspection and EICR Coding · pp. 55-62
  1. Recommended intervals
  2. Extent, limitations and sampling
  3. The four codes
  4. Coding C1: danger present
  5. Coding C2: potentially dangerous
  6. Coding C3 and when it's not a code at all
  7. FI: further investigation
  8. Satisfactory or unsatisfactory
IXRevision for the Practical and the Written Exam · pp. 63-68
  1. The full sequence on one page
  2. Key numbers to know
  3. Ring final readings that don't add up
  4. Zs worked corrections
  5. Most frequently asked in the written exam
  6. Practical day checklist

One Page, One Topic, All Clear

Think of it this way:

You're doing R1+R2 on a radial with the assessor watching. You need the link in the right place and a reading you can trust.

You open the R1+R2 page and the circuit is drawn: line and cpc linked at the board, the probes at the far end, and where the reading goes on the schedule.

Regulation 643.10: switchgear, controls, interlocks, isolators and the RCD test button.

Same with the ring final end-to-end, insulation resistance minimums, maximum Zs and the 80% rule, RCD testing and C2 versus C3: each one on its own page.

Inspection & Testing Illustrated is 68 pages in 9 parts, every topic drawn, and it ends with a revision part for the practical and the written exam.

What you see drawn, you don't have to memorize.

What's Inside Inspection & Testing Illustrated:

Ipp. 5-11

Before You Pick Up the Tester

Initial verification vs periodic inspection, what the 2391 asks of you, your documents, the multifunction tester, GS38 leads, calibration and earthing systems.

IIpp. 12-17

Safe Isolation

Why it comes first, the isolation sequence step by step, prove–test–prove, every dead combination, locking off and isolating for Ze and bonding.

IIIpp. 18-23

Inspection Before Testing

Why inspection comes first, the origin, earthing and main bonding, cable routes and zones, bathrooms, and what you check by eye on RCDs, AFDDs and SPDs.

IVpp. 24-35

Dead Tests, in Order

The dead test sequence, bonding continuity, R1+R2 and R2, the ring final in 3 steps, insulation resistance, polarity and the TT earth electrode: so you never clip on for insulation before continuity.

Vpp. 36-43

Live Tests, in Order

The live sequence, Ze, Zs, PSCC and PEFC, RCD testing and tester set-up, functional testing, phase sequence and voltage drop.

VIpp. 44-49

Maximum Zs and Disconnection Times

The disconnection chain, disconnection times, the maximum Zs tables, the 80% rule, Type B, C and D, and what to check when Zs is too high: so a reading on the tester becomes a pass or a fail you can explain.

VIIpp. 50-54

Certificates and Schedules

EIC, Minor Works or EICR, the Schedule of Circuit Details, the Schedule of Test Results, supply characteristics and signatures.

VIIIpp. 55-62

Periodic Inspection and EICR Coding

Recommended intervals, extent and limitations, the four codes, C1, C2, C3, FI, and satisfactory or unsatisfactory.

IXpp. 63-68

Revision for the Practical and the Written Exam

The full sequence on one page, key numbers, ring readings that don't add up, Zs worked corrections, what's most asked and a practical day checklist.

At the end of the book: A revision part with the full sequence on one page, key numbers, Zs worked corrections and a practical day checklist.

Plus: 2 Free Books

Inspection & Testing Exam-Style Questions

BONUS 1: «Inspection & Testing Exam-Style Questions»

Value on its own: US$ 17.90

Practise with exam-style questions on every test, Zs calculation and coding, each answer explained with a drawing, so you know where you stand before the real thing.

The 15 Most Common Testing Mistakes

BONUS 2: «The 15 Most Common Testing Mistakes»

Value on its own: US$ 14.90

The errors electricians make most often on the practical and on the schedules, each one shown before and after, so you can spot them before an assessor does.

Inspection & Testing Illustrated with 2 Free Books

  • Inspection & Testing Illustrated: 68 illustrated pagesUS$ 63
  • BONUS 1: Inspection & Testing Exam-Style QuestionsUS$ 17.90
  • BONUS 2: The 15 Most Common Testing MistakesUS$ 14.90
  • High-resolution PDF to printIncluded
Total value US$ 95.80
YOUR PRICE:
US$ 27
You save US$ 68.80
YES, I WANT INSPECTION & TESTING ILLUSTRATED FOR US$ 27

📄 This is a digital PDF book sent to your email: nothing is printed or shipped.

Secure purchaseEncrypted payment30-day guarantee

PDF by email: We email you Inspection & Testing Illustrated as a PDF, together with the two free books. It's a single payment: no installments, no extra charges.

Who This Book Is For

You're on the 2391 course

You're on the 2391 course

Each evening you study one test on one page, always in the same order, so the sequence builds up instead of slipping away.

Your practical is coming up

Your practical is coming up

The full sequence on one page, the key numbers and the Zs corrections, ready to go over the night before.

You already do EICRs

You already do EICRs

Coding C1, C2, C3 or FI drawn case by case, and the maximum Zs pages printed for the van.

Everything You Get Today

US$ 95.80US$ 27
YES, I WANT INSPECTION & TESTING ILLUSTRATED FOR US$ 27

📄 This is a digital PDF book sent to your email: nothing is printed or shipped.

30DAYS
GUARANTEE

30-Day Guarantee

Try Inspection & Testing Illustrated for 30 days, bonus books included.

We refund everything if the file won't open, if the book isn't what you see here, if you were charged twice or if the email doesn't arrive. Just email us.

You pay once. No subscriptions.

Frequently Asked Questions

Is it for me if I've been installing for years but have never done inspection and testing?

Yes. It doesn't teach you to wire: it starts from safe isolation and takes you through every test, the schedules and EICR coding, in the order you'll use them. It follows the UK route (BS 7671, GN3 and the 2391). If you're doing the 2394 and 2395 separately, the initial verification parts match the 2394 and the periodic inspection and EICR parts match the 2395.

Where does the content come from?

From BS 7671 (current edition and amendment), IET Guidance Note 3, the IET On-Site Guide, HSE GS38 and the 2391 qualification specification. The maximum Zs values come from the tables of the current amendment. It doesn't replace GN3 or the On-Site Guide: those are for looking things up, this is for learning the order and the numbers, one drawn page at a time.

Is it official material?

No. It's an independent study book, not published or endorsed by City & Guilds, the IET or BSI. Always keep the current BS 7671 to hand.

Does it replace the course?

No. It doesn't replace accredited training or supervised practical experience, and it doesn't give you a qualification or certificate. It helps you understand and revise what the course and the practical ask of you.

Are the practice questions the ones from the exam?

No. They're exam-style questions written for this book, not official questions from any exam.

How do I receive it?

As a PDF by email, to the address you enter at checkout. The 2 included books come the same way.

Do I have to pay every month?

No. It's a one-off payment.

Can I have it on paper?

It's a PDF you can print, all of it or just the pages you want for the van or the tester case.

How does the refund work?

You have 30 days. We refund everything if the file won't open, if the book isn't what you see on this page, if you were charged twice or if the email doesn't arrive: just email us.

Before You Close This Page

No more rereading with nothing staying in.

The ring final, Zs and coding: you see them drawn and they click.

You get to the practical knowing where everything is.

Drawings make studying faster.

The book is right below.

One-time payment: US$ 27 · Guarantee: 30 days · PDF by email

YES, I WANT INSPECTION & TESTING ILLUSTRATED FOR US$ 27

📄 This is a digital PDF book sent to your email: nothing is printed or shipped.